Berlin Wind Turbine Back On Track

Posted by Shorebread | Friday, September 13, 2013
BERLIN — A few technical setbacks have delayed the construction of Berlin’s first wind turbine but all bugs have been eliminated and blades should be spinning this November. The snag came this summer while testing materials that would be used in the turbine, according to Doug Richard, owner of DDU Magnetics. However, there was a silver lining as a probe into the malfunctions led to new discoveries. “We were … READ MORE